Wpc Installation Steps
- Share
Decking
1.Install the joist on the cement floor, and the gap between two adjacent joists is no more than 35cm.
2.When the decking is to an end, please use two joists and gap between them is at least 5mm.
Install the first decking.
Install the first decking.